Devanahalli, Bengaluru North · Apartments

Green Valley Heights

Two towers of 2 and 3 BHK homes beside Green Valley Residency: east-facing park views, a pool deck between the towers, a clubhouse and EV-ready parking. Walk through any flat in 3D, see how far your floor has been built, and pay only as each slab is cast.

58%
Construction progress
Last update 28 Oct 2026: Tower A: 11th slab done, Tower B flooring started
55
Available
112
Total flats
₹82.7 L
From
RERA registered
PRM/KA/RERA/1250/303/PR/SAMPLE/0002
Possession promised
31 Mar 2028

Towers on site

Tower A
16 floors · 4 flats a floor · 32 of 64 available
46%
  • Foundation
    100%
  • Structure (slabs)
    69%
  • Blockwork and plaster
    44%
  • Electrical and plumbing
    25%
  • Flooring and finishing
    8%
  • Facade and paint
    0%
11 of 16 slabs castRoof slab ~Mar 2027Developer’s target 31 Dec 2027
Tower B
12 floors · 4 flats a floor · 23 of 48 available
74%
  • Foundation
    100%
  • Structure (slabs)
    100%
  • Blockwork and plaster
    83%
  • Electrical and plumbing
    58%
  • Flooring and finishing
    34%
  • Facade and paint
    25%
12 of 12 slabs castDeveloper’s target 31 Aug 2027

Floor plans

2 BHK · Type A

913 sq ft carpet · 1285 super
ENTRY ↓Kitchen10′6″ × 11′2″ · 117 sq ftFoyerCommon bathroomMaster bathroom10′6″ × 8′6″ · 90 sq ftBedroom 211′2″ × 16′5″ · 183 sq ftLiving and dining12′6″ × 16′5″ · 205 sq ftMaster bedroom10′6″ × 16′5″ · 172 sq ftBalcony
37 available · from ₹82.7 LWalk through it in 3D

3 BHK · Type B

1326 sq ft carpet · 1860 super
ENTRY ↓Kitchen11′2″ × 11′10″ · 132 sq ftCommon bathroomFoyerBedroom 311′2″ × 11′10″ · 132 sq ftMaster bathroom10′6″ × 7′10″ · 83 sq ftDressingBedroom 211′10″ × 17′1″ · 202 sq ftLiving and dining22′4″ × 17′1″ · 381 sq ftMaster bedroom11′10″ × 17′1″ · 202 sq ftBalcony
18 available · from ₹1.20 CrWalk through it in 3D

Pay as the building rises

A construction-linked plan: each part falls due only when that stage is built and certified.

  1. 1.Booking amount10%
  2. 2.Agreement for sale10%
  3. 3.On completion of foundation15%
  4. 4.On casting of the 4th slab10%
  5. 5.On casting of the 8th slab10%
  6. 6.On casting of the 12th slab10%
  7. 7.On casting of the roof slab10%
  8. 8.On completion of masonry10%
  9. 9.On flooring and finishing10%
  10. 10.On possession5%

Amenities

  • Swimming pool
  • Clubhouse with gym
  • Children's play area
  • Jogging track
  • Indoor games
  • EV charging
  • 24x7 security
  • Power backup
  • Rainwater harvesting
  • Sewage treatment plant

Construction updates

  1. 28 Oct 2026Project 48%
    Tower A: 11th slab done, Tower B flooring started

    Vitrified flooring has started on the lower floors of Tower B; sample flat finishing is under way.

  2. 12 Oct 2026Project 42%
    Tower A: 10th floor slab cast

    Shuttering has moved to the 11th floor. Plumbing sleeves are in up to the 8th floor.

  3. 16 Sept 2026Project 38%
    Tower B: roof slab cast

    All 12 slabs of Tower B are cast. Blockwork has reached the 10th floor.

Documents

No documents uploaded yet.

Announcements

Nothing new.