REMMO
Back to Green Valley Heights
Green Valley Heights · Tower A · 1st floor

Flat A-0101

3 BHK · Type B1326 sq ft carpet1860 sq ft superEast-facing balconyPark viewCorner flat
Available
₹1,20,44,000
₹6,475/sq ft+16% since launch
Drag to look around, tap the floor to walk
KitchenBathFoyerBedroom 3BathDressingBedroom 2LivingMasterBalconyN
Flat A-0101 · from today on site to your finished home
10:30 am

Your floor on site today

Last site update 28 Oct 2026
1st floor: Interiors done

Flooring, doors, windows and paint are done on this floor.

  • Slab castDone
  • Walls upDone
  • Electrical and plumbingDone
  • Interiors doneDone
  • Whole tower finished~Feb 2029
Tower A: 11 of 16 slabs cast46.03%
Promised possession 31 Mar 2028· RERA PRM/KA/RERA/1250/303/PR/SAMPLE/0002

Dates are estimates from the tower’s actual pace in recent site updates, not promises. They move as work speeds up or slows down.

Booking amount (10%)₹12,04,400

How the price is built

  • Base rate₹6,250/sq ft
  • Floor rise (1st floor)—
  • Park view premium+₹150/sq ft
  • Corner premium+₹75/sq ft
  • × 1,860 sq ft super area₹1,20,44,000
  • Car parking2 covered, included
  • Maintenance (after handover)₹3.5/sq ft a month
  • Stamp duty and registrationExtra, at registration
Demo Developers Pvt Ltd
Verified developer · +91 80 4000 0000
GST 29ABCDE1234F1Z5

Pay as the building rises

Construction-linked plan · 45% of stages already reached in Tower A

You pay each part only when that stage is actually built. If you book today, the stages already done fall due together; the rest wait for the site.

StageShareAmountWhen
Booking amountAt booking
10%₹12,04,400At booking
Agreement for saleWithin 30 days
10%₹12,04,400—
On completion of foundationFoundation complete
15%₹18,06,600Due on booking
On casting of the 4th slab4th floor slab cast
10%₹12,04,400Due on booking
On casting of the 8th slab8th floor slab cast
10%₹12,04,400Due on booking
On casting of the 12th slab12th floor slab cast
10%₹12,04,400~Dec 2026
On casting of the roof slabRoof slab cast
10%₹12,04,400~Mar 2027
On completion of masonryBlockwork and plastering complete
10%₹12,04,400~Jul 2027
On flooring and finishingFlooring, doors and windows complete
10%₹12,04,400~Feb 2029
On possessionAt handover and registration
5%₹6,02,200~Apr 2029

95% is paid during construction and the rest at handover. Expected dates come from the current pace on site.

As an investment

  • Expected rent after handover₹31,500/month
  • Gross rental yield3.1%
  • Net yieldafter maintenance, a month empty and upkeep2.1%
  • Price at launch → today₹1.04 Cr → ₹1.20 Cr
  • Years until keys1.4

Rent assumption: ₹17/sq ft a month on super area (Demo assumption: ₹ per sq ft of super area per month; check local listings). Rents vary; check current listings nearby.

Price outlook: a range, not a promise

Scenarios from stated assumptions
1 yr3 yr5 yrtoday₹1.20 Cr₹2.20 Cr₹1.92 Cr₹1.55 Cr
InCautious (≈5.2%/yr)Middle (≈9.7%/yr)Strong (≈12.8%/yr)
1 year₹1.28 Cr₹1.33 Cr₹1.37 Cr
3 years₹1.43 Cr₹1.63 Cr₹1.77 Cr
5 years₹1.55 Cr₹1.92 Cr₹2.20 Cr
How this is worked out
  • • This project's own price list has risen about 11.9% a year since launch. Early-phase increases rarely last, so it gets 35% weight (capped at 12%).
  • • Long-run trend for plotted land in the area: 6.0% a year (65% weight). Core growth: 8.1% a year.
  • • Infrastructure adds a one-time step-up spread over a few years: Airport metro line +1.2%/yr for 3 yr; Satellite town ring road +0.6%/yr for 3 yr; Proposed business park nearby +0.4%/yr for 5 yr. Projects under construction count at 60% of their expected effect, planned ones at 30%; existing ones are already in today's price.
  • • Cautious and strong cases move core growth by −4.5 and +3 points. Over 5 years that works out to 5.2%, 9.7% and 12.8% a year.
  • • Resale also depends on demand at the time, the condition of the layout, and costs of selling (brokerage, stamp duty for the next buyer).

This is not investment advice and not a valuation. Prices can fall as well as rise, under-construction flats can be delayed, and resale takes time and costs money.

Price history

1.02 Cr1.13 Cr1.23 Cr2026

Before you buy

  • RERA registeredRegistration PRM/KA/RERA/1250/303/PR/SAMPLE/0002. Check it on the Karnataka RERA website.
  • Layout approval and land conversion on fileAsk for the approved layout plan and conversion order.
  • Title documents sharedAsk for the title deed and encumbrance certificate.
  • Construction on schedule66% done vs 70% planned by today; development forecast to finish around Jul 2027.
  • Developer track recordVerified developer; no completed projects on REMMO yet. Visit their earlier sites.
  • Demand in the project (resale ease)49% of plots already booked or sold.
  • Price vs the rest of the project₹6,475/sq ft vs project average ₹6,850/sq ft.

Floor plan

3 BHK · Type B · 1326 sq ft carpet · 1500 built-up · 1860 super
ENTRY ↓Kitchen11′2″ × 11′10″ · 132 sq ftCommon bathroomFoyerBedroom 311′2″ × 11′10″ · 132 sq ftMaster bathroom10′6″ × 7′10″ · 83 sq ftDressingBedroom 211′10″ × 17′1″ · 202 sq ftLiving and dining22′4″ × 17′1″ · 381 sq ftMaster bedroom11′10″ × 17′1″ · 202 sq ftBalconyN

Corner 3 BHK with a 22 ft living and dining room, a walk-in dressing area for the master bedroom and a wide balcony.

Amenities

  • Swimming pool
  • Clubhouse with gym
  • Children's play area
  • Jogging track
  • Indoor games
  • EV charging
  • 24x7 security
  • Power backup
  • Rainwater harvesting
  • Sewage treatment plant

Carpet area is the usable floor inside your walls (as defined by RERA). Super area adds walls, balcony and a share of lobbies and the clubhouse; prices are quoted on super area.

True cost and EMI

What you actually pay

  • Plot price₹1,20,44,000
  • Stamp duty (5%)standard Karnataka rate; lower slabs may apply under ₹45 L₹6,02,200
  • Surcharge and cesscess + surcharge ≈ 13% of stamp duty₹78,286
  • Registration (2%)₹2,40,880
  • Legal check, khata, misc.typical, varies₹25,000
  • Total cost of ownership7.9% over the plot price₹1,29,90,366
Confirm on Kaveri Online (Govt. of Karnataka)

Loan and EMI

Monthly EMI
₹90,280
Cash you need upfront
₹39.6 L

Total interest over 15 years: ₹72.2 L. Banks usually lend up to 75–80% of the registered value for plots, and many lend on plots only with a construction plan. Rates are illustrative; check with your bank.