A 6.5-acre gated plotted layout with 40 ft and 30 ft internal roads, underground drainage, a central park and a clubhouse. Sample project for the REMMO demo.

55%
Development progress
Last update 28 Oct 2026: Road started
15
Available
29
Total plots
₹27.6 L
From
RERA registered
PRM/KA/RERA/SAMPLE/0001

What’s been built

100%
Compound wall and gate
70%
Internal roads
75%
Storm water drains
35%
Street lights and cabling
40%
Overhead water tank
15%
Central park
30%
Clubhouse

Construction updates

  1. 28 Oct 2026ClubhouseProject 55%
    Road started

    Street lights halogen to.led

  2. 6 Oct 2026Internal roadsProject 53%
    Internal roads: wet-mix base complete

    All internal roads have the wet-mix macadam base. Asphalt starts after the monsoon.

  3. 15 Sept 2026ClubhouseProject 47%
    Clubhouse foundation complete

    Foundation and plinth for the clubhouse are done.

  4. 21 Aug 2026Storm water drainsProject 44%
    Drains extended to Block C

    Drain lines run along both sides of the main road.

  5. 17 Jul 2026Street lights and cablingProject 42%
    First street light poles installed

    Poles along the 40 ft main road are up and wired.

  6. 17 Jun 2026Central parkProject 38%
    Central park: levelling and pathways

    Walkway kerbs are in. Planting starts after the monsoon.

  7. 18 May 2026Overhead water tankProject 37%
    Overhead tank: column work done

    The 1 lakh litre tank columns reached full height.

  8. 18 Apr 2026Street lights and cablingProject 33%
    Underground cabling started

    BESCOM-approved trenching has begun along Block C.

  9. 9 Mar 2026Storm water drainsProject 31%
    Drains complete for Blocks A and B

    Culverts at both road crossings are finished.

  10. 8 Jan 2026Internal roadsProject 26%
    Granular sub-base laid on main roads

    GSB layer compacted on the 40 ft roads. 30 ft roads next.

  11. 30 Oct 2025Storm water drainsProject 19%
    Storm water drains: Block A started

    Precast drain sections are being placed along the main road.

  12. 11 Aug 2025Internal roadsProject 14%
    Road formation and earthwork started

    Excavation and compaction for the 40 ft main road are under way.

  13. 13 May 2025Compound wall and gateProject 9%
    Compound wall complete with main gate

    Wall plastered and painted on all four sides. Security cabin foundation is in.

  14. 19 Mar 2025Compound wall and gateProject 3%
    Compound wall foundation laid

    Footing and plinth beam complete on the north and east sides.

Documents

  • RERA registration certificate
    rera · PDF
    Open
  • Approved layout plan (BIAAPA)
    approval · PDF
    Open
  • DC conversion order
    approval · PDF
    Open
  • Title deed and EC (13 years)
    legal · PDF
    Open
  • Project brochure
    brochure · PDF
    Open

Announcements

  • 11 Oct 2026
    Open house this Sunday, 10 am to 4 pm

    Walk the site with our team. A free shuttle runs from the Devanahalli bus stand every 30 minutes.

  • 28 Sept 2026
    Next price revision on 1 January 2027

    Bookings made before 31 December keep today’s price.

Location

Near Devanahalli, Bengaluru North (sample address)

Open in Google Maps